Carelabs·United Kingdom Power System Engineering·BS 7671·IET Wiring Regulations·HSR25·IEEE 1584·IEC 60909·ETAPCarelabs·United Kingdom Power System Engineering·BS 7671·IET Wiring Regulations·HSR25·IEEE 1584·IEC 60909·ETAPCarelabs·United Kingdom Power System Engineering·BS 7671·IET Wiring Regulations·HSR25·IEEE 1584·IEC 60909·ETAP
ARC FLASH · UNITED KINGDOM

Arc Flash Studies for UK Duty Holders

UK law creates the duty but does not prescribe the method. The Electricity at Work Regulations 1989 require you to prevent danger from electrical systems, and BS 7671 governs the installation, but neither tells you how to calculate incident energy. That gap is the study's job, and it is why the assumptions behind a UK arc flash report matter more than the number it prints.

BS 7671 · IET Wiring Regulations · HSR25 · IEEE 1584 · IEC 60909

What We Deliver

What a UK Arc Flash Study Has to Establish

There is no British standard for arc flash calculation. What defends the assessment is the quality of the fault level data and the reasoning recorded alongside it.

01

A defensible EAWR 1989 risk assessment

Regulation 4(3) requires systems to be maintained to prevent danger, and Regulation 14 restricts live working. The study is the evidence that the risk was assessed and the controls chosen were suitable and sufficient.

02

Fault level data from your DNO

Prospective fault current comes from the Distribution Network Operator for your licence area, of which there are fourteen in Great Britain. We request it in writing rather than assume it, because the figure drives every downstream calculation.

03

IEEE 1584 applied, with its basis stated

With no UK method prescribed, IEEE 1584-2018 is the convention in industrial settings. Because it is a convention rather than a requirement, the report records why the model was chosen and where its assumptions bound the result.

04

BS 7671 as the installation baseline

BS 7671:2018+A2:2022 sets the installation standard, including the Amendment 2 requirements for arc fault detection devices. It governs the system being assessed, not the assessment itself.

Our Process

How We Run a UK Arc Flash Study

01

Confirm the duty holder and scope

Establish who holds the EAWR 1989 duty for the installation, which parts are in scope, and where the DNO boundary sits.

02

Request DNO fault data

Obtain prospective fault current and clearing characteristics in writing from the Distribution Network Operator for the licence area.

03

Site survey

Verify the single line diagram, record equipment ratings and conductor routes, and capture protective device settings as found.

04

Model and calculate

Short-circuit and coordination study, then incident energy to IEEE 1584-2018, with the method basis recorded in the report.

05

Label, report and advise

Labelling, PPE recommendations and a written assessment that supports the duty holder's position under EAWR 1989.

WHAT GOES WRONG

Where UK Arc Flash Assessments Fall Down

Because no British standard prescribes a method, a UK assessment is only as defensible as the data and reasoning behind it. These are the weaknesses that matter if the HSE asks to see the basis.

FAQ

Frequently Asked Questions

Is an arc flash study a legal requirement in the UK?

Not by name. The Electricity at Work Regulations 1989 require you to prevent danger from electrical systems, and the Management of Health and Safety at Work Regulations require a suitable and sufficient risk assessment. No British standard prescribes how to assess arc flash risk, so the study is the means of discharging a duty that does exist rather than a standard you are audited against.

Does BS 7671 cover arc flash?

BS 7671:2018+A2:2022, the IET Wiring Regulations, is an installation standard. It governs how the system is designed and installed, including the Amendment 2 requirements for arc fault detection devices, but it does not set out a method for calculating incident energy or selecting PPE. It describes the system being assessed, not the assessment.

Where does the fault level data come from?

From the Distribution Network Operator for your licence area. Great Britain has fourteen DNO areas, and the prospective fault current at your supply is theirs to confirm. We request it in writing because an assumed figure undermines every calculation that follows, and because a network reinforcement can change it without notice to the site.

Which calculation method should a UK study use?

IEEE 1584-2018 is the usual choice in industrial settings, and IEC 60909 or ENA Engineering Recommendation G74 are used for fault level work. Because no UK standard mandates a method, what matters is that the report states which was used and why it suits the installation, so the reasoning can be examined later.

Assess the Duty, Not Just the Incident Energy

your study?