Skip to content
Power quality · P2-16

EMC Compliance Assessment IEC 61000

Assessment of electromagnetic compatibility at installation level: whether the emissions present are within the compatibility levels for the environment class, and whether installed equipment has the immunity to tolerate them. EMC problems are interaction problems, and neither side can be assessed alone.

What this study establishes.

Electromagnetic environment classification for the installation per IEC 61000-2-4.

Conducted disturbance measurement — harmonics, interharmonics, signalling voltages, fast transients.

Immunity review of installed equipment against declared IEC 61000-4 test levels.

Installation practice assessment — segregation, earthing, bonding, screening and cable routing.

Gap register where emission exceeds compatibility level, or immunity falls short of environment.

Remediation plan addressing source, path and victim rather than the victim alone.

What the work covers.

Assessment of electromagnetic compatibility at installation level: whether the emissions present are within the compatibility levels for the environment class, and whether installed equipment has the immunity to tolerate them. EMC problems are interaction problems, and neither side can be assessed alone.

EMC in an installation is usually resolved by fixing the path rather than the source or the victim. Segregation distance, screen termination practice and the integrity of the bonding network account for the majority of findings, and all three are installation workmanship rather than equipment selection.

Deliverables

What lands in your inbox.

01

Electromagnetic environment classification for the installation per

Electromagnetic environment classification for the installation per IEC 61000-2-4.

02

Conducted disturbance measurement

Conducted disturbance measurement — harmonics, interharmonics, signalling voltages, fast transients.

03

Immunity review of installed equipment against declared

Immunity review of installed equipment against declared IEC 61000-4 test levels.

04

Installation practice assessment

Installation practice assessment — segregation, earthing, bonding, screening and cable routing.

05

Gap register where emission exceeds compatibility level,

Gap register where emission exceeds compatibility level, or immunity falls short of environment.

06

Remediation plan addressing source, path and victim

Remediation plan addressing source, path and victim rather than the victim alone.

Methodology

How we run it.

01

Scope & data capture

We confirm the question the study must answer, agree the measurement or modelling points, and collect what the work depends on: equipment inventory with emc declarations and immunity classifications; cable routing and segregation drawings, and the earthing and bonding arrangement; symptom log identifying which equipment.

Agreed scope · Named lead engineer
02

Measurement & modelling

Engineers carry out the measurement and modelling on site and in software, under operating conditions representative of the problem rather than a single convenient snapshot.

Calibrated model · Raw records
03

Analysis against standard

Results are assessed against IEC 61000-2-4, IEC 61000-4 series, IEC 61000-6-2 and IEC 61000-6-4, with the assessment basis and any measurement uncertainty stated rather than implied.

Compliance position
04

Report & recommendations

You receive a signed engineering report with findings ranked by consequence, the reasoning behind each conclusion, and mitigation options costed so they can be acted on or deferred deliberately.

Signed report · Costed actions
Aligned standards

Assessed against the published limits.

IEC 61000-2-4IEC 61000-4 seriesIEC 61000-6-2 and IEC 61000-6-4IEC 61800-3IEC 60364-4-44IEC 61000-2-4IEC 61000-4 seriesIEC 61000-6-2 and IEC 61000-6-4IEC 61800-3IEC 60364-4-44
Notes & Queries

Common questions.

01

Typically in one of these situations: control or instrumentation systems behaving erratically near power equipment; commissioning a new drive, welding or rf installation next to sensitive systems; recurring communication errors on field buses or instrumentation loops. If none of these apply, the study is unlikely to be the right next step and we will say so.

02

To scope and run the work we need equipment inventory with emc declarations and immunity classifications; cable routing and segregation drawings, and the earthing and bonding arrangement; symptom log identifying which equipment misbehaves and when. Where any of it is missing we can establish it on site, which changes the scope rather than blocking the work.

03

Primarily IEC 61000-2-4, IEC 61000-4 series, IEC 61000-6-2 and IEC 61000-6-4, IEC 61800-3. The applicable framework depends on your connection agreement and jurisdiction, so we confirm which applies before measurement rather than after.

Ready to start the engagement?

Tell us about your site and the problem you are seeing. We come back with a fixed scope, a fixed fee, and a named lead engineer.