POWER QUALITY · SAUDI ARABIA
Power Quality Analysis for Saudi Industrial Sites
Power quality limits in Saudi Arabia are set at a boundary, and which boundary depends on the asset. A plant connected to the Saudi Electricity Company is measured at its point of common coupling under SEC requirements. Inside an Aramco facility the SAES-P standards apply instead. On the giga-projects the grid is effectively private, so the limits are the project's own.
Free ConsultationWhat a Saudi Power Quality Study Has to Establish
Measurement is the easy part. Knowing which limits you are measured against, and at which point, is what makes the result usable.
What We Deliver
The governing point of common coupling
Harmonic and flicker limits apply at a defined boundary. For an SEC-connected plant that is the utility interface; inside an Aramco asset or giga-project grid it is internal, and measuring at the wrong point answers the wrong question.
WHAT GOES WRONG
Where Saudi Power Quality Studies Fail
Most rejected power quality studies measured correctly and concluded wrongly, because the limits applied were not the limits the asset owner uses.
- Harmonics judged against IEEE 519 when the asset owner specifies SAES-P limits.
- Measurement taken downstream of the real point of common coupling.
- A single short recording used to characterise a plant with seasonal load variation.
- VFD and UPS contributions assessed at part load rather than across the operating range.
- Giga-project sites assessed against SEC limits when the grid is private.
- No re-measurement after a filter, capacitor bank or large drive was added.
THE OUTCOMES
What the Report Contains
The report names the limit set and the measurement point before it presents a single number, because a distortion figure without those two facts cannot be checked by anyone downstream.
- 1Governing limit set stated: IEEE 519, IEC 61000 or SAES-P
- 2Measurement point identified on the single line diagram
- 3Recorded voltage and current distortion across the operating range
- 4Flicker, unbalance and individual harmonic orders
- 5Mitigation options with expected effect
- 6Instrument, recording window and assumptions
How We Run a Saudi Power Quality Study
Establish the governing limits
Confirm whether the site answers to SEC requirements, Aramco SAES-P or a project specification, and fix the point of common coupling before any instrument is installed.
Clear permits and access
Arrange permit to work and HSE pre-mobilisation, and confirm HCIS constraints on electrical room access where the facility is security-cleared.
Measure across the operating range
Install recorders at the agreed points for a window long enough to capture real plant behaviour, including the heaviest drive and process loading.
Analyse against the limit set
Assess voltage and current distortion, individual harmonic orders, flicker and unbalance against the standard that actually governs the asset.
Report and recommend
Findings with mitigation options, expected effect and the measurement basis, in a form the asset owner or underwriter can audit.