Skip to content

Power System Testing

Proactive Safety: Reducing Arc Flash Risks in Australia

Carelabs delivers arc flash hazard analysis for industrial and commercial facilities across Australia, calculating incident energy levels and PPE requirements in line with AS/NZS 4836. Our engineers use ETAP modelling and the IEEE 1584 calculation method to identify arc flash boundaries at every point in your electrical distribution system — helping you reduce risk before it causes injury or unplanned downtime, and giving your site a clear, documented path to compliance.

Free Consultation

Why Facilities Trust Carelabs

Our engineers identify and resolve electrical safety risks before they become costly incidents.

WORKER SAFETY

Protecting Your Team

Electrical hazards are a leading cause of workplace injuries in Australia. Safe Work Australia's model WHS framework, implemented through AS/NZS 4836, requires facility owners to identify and control electrical risks before workers are exposed to them.

Contact Us

Deliverables

What You Receive

Every engagement concludes with an AS/NZS 3000-aligned report package: incident energy calculations per bus and panel, PPE-category labelling ready for installation, and single-line diagrams reflecting your current equipment ratings.

Reach Out

Schedule Your Proactive Safety: Reducing Arc Flash Risks

Tell us about your project.