Power System Testing
Proactive Safety: Reducing Arc Flash Risks in Australia
Carelabs delivers arc flash hazard analysis for industrial and commercial facilities across Australia, calculating incident energy levels and PPE requirements in line with AS/NZS 4836. Our engineers use ETAP modelling and the IEEE 1584 calculation method to identify arc flash boundaries at every point in your electrical distribution system — helping you reduce risk before it causes injury or unplanned downtime, and giving your site a clear, documented path to compliance.
Free ConsultationWhy Facilities Trust Carelabs
Our engineers identify and resolve electrical safety risks before they become costly incidents.
WORKER SAFETY
Protecting Your Team
Electrical hazards are a leading cause of workplace injuries in Australia. Safe Work Australia's model WHS framework, implemented through AS/NZS 4836, requires facility owners to identify and control electrical risks before workers are exposed to them.
Contact UsDeliverables
What You Receive
Every engagement concludes with an AS/NZS 3000-aligned report package: incident energy calculations per bus and panel, PPE-category labelling ready for installation, and single-line diagrams reflecting your current equipment ratings.
Reach OutSchedule Your Proactive Safety: Reducing Arc Flash Risks
Tell us about your project.