Protection Coordination Made Reliable

Give your power systems the right protection from cascading faults with an in-depth relay coordination study in Malaysia.

Get Started
experts analyzing relay coordination studies
Solution

Efficient Fault Management with Top Relay Coordination Study

Ensure the protective devices like relays are properly set and working synchronously with Care Labs’ protection coordination study.  Partner with us to implement the best cost-effective solutions for efficient fault isolation. Experience operational continuity without any disruptions with effective relay and circuit breaker coordination.

Engineers using ETAP to analyze relay coordination with a 3D power system model
Support

Staunch Support For Rapid Fault Isolation

Avail of Care Labs’ end-to-end support in optimizing the protection coordination in Malaysian industries. Count on us to safeguard your systems from cascading faults and costly disruptions.

  • Technical Support

Our team of electrical engineers has the expertise to offer intelligent solutions using ETAP coordination study in Malaysia.

  • Safety And Compliance Support

Stay safe and adhere to standards for electrical safety in Malaysia with Care Labs’ relay coordination study.

Engineers monitoring real-time data for fault protection.
Technology

ETAP- Coordination Study Software

ETAP software helps simulate the various fault conditions and analyze the relay settings during a relay coordination study.  At Care Labs, our engineers use ETAP to generate TCC curves to evaluate the coordination of the protective devices. Optimize the fault isolation with Care Labs’ expertise and cutting-edge tools like ETAP.

Care Labs Engineer monitoring relay coordination study on computer
System

Equipment That Needs Protection Coordination Study

Care Labs performs relay coordination studies on many electrical devices in a facility in Malaysia.

  • Power Transmission & Distribution Systems- Transmission Lines,  Substations & Switchgear, Transformers, Busbars & Bus Ducts
  • Industrial & Commercial Power Systems-  MCCs, Circuit breakers  & fuses, Panelboards, ATS.
  • Backup & Emergency Power Systems- UPS, Generators.
Industries served

Industries Where Arc Flash Analysis is Non-Negotiable

Arc Flash analysis is critical for industries with complex circuits and Work safe, NZ recommends these risks be mitigated effectively.

Oil & Gas, Petrochemical, and Chemical Plants

Manufacturing Facilities like Food & Beverage Processing Plants, Automotive & Manufacturing

Commercial Buildings & High-Rise Developments like hospitals, shopping malls

To receive a free quote, please provide details about your industry.

Sign up

FAQ's

Relay Coordination Study In Malaysia - Q & A

Get answers to the most common queries. Care Labs helps industries grow by perfecting their power systems with premium solutions.

Question
What are the penalties for non-compliance with relay coordination requirements?
Answer

There are many legal, operational, and financial implications for not abiding by compliance standards, like disconnection from the grid, ST fines, cascading failures, and lawsuits for safety violations. Contact Care Labs to help you solve these challenges.

Question
Can a relay coordination study help reduce downtime and improve overall system reliability?
Answer

Yes, by fault isolation. When protective relays work in coordination with a proper setting, they help isolate a faulty section from a healthy section in a power system. This helps reduce disruptions and costly repairs by limiting the faults from escalating. At Care Labs, we put our expertise to make your facility safe, reliable, and compliant with electrical safety standards.

Question
What is the expected return on investment (ROI) from a well-coordinated relay system?
Answer

 A well-coordinated relay system prevents small faults from escalating, thereby reducing downtime and costly repairs. This also helps improve efficiency and ensures compliance with local and global standards. The ROIs can be summarized as higher safety, improved uptime, lower insurance risks, extended equipment life span, and compliance with standards.

Question
Can relay coordination help mitigate arc flash risks?
Answer

Yes, relay coordination helps mitigate arc flash risks. Faster fault isolation results in lesser incident energy, which helps in reducing potential arc flash risks. For detailed protection coordination and arc flash insights, please contact Care Labs today!

Question
What are time-current curves (TCCs), and how are they used in coordination?
Answer

The TCC curve is a graphic plot between fault currents and time. It gives insights into how protective devices respond to fault currents over time. TCC analysis helps optimize fault isolation, thereby preventing outages and equipment damage.