POWER QUALITY · INDIA
Power Quality Analysis for Indian Industrial Plant
In India power quality is enforced from both directions. The distribution licensee sets what you may inject back into its network, and your own process sets what it can tolerate. Harmonic limits are assessed at the point of common coupling with the DISCOM, usually against IEEE 519, while the CEA Regulations 2023 govern the installation itself.
Free ConsultationWhat an Indian Power Quality Study Has to Establish
Two different obligations meet at the same meter: what the DISCOM will accept, and what your plant can survive.
What We Deliver
Harmonic limits at the DISCOM boundary
Distortion is assessed at the point of common coupling with the distribution licensee. IEEE 519 is the usual reference, and the DISCOM's own supply code may impose more. The study fixes the measurement point before anything is recorded.
WHAT GOES WRONG
Where Indian Power Quality Studies Fall Short
The common failure is attributing a problem to the wrong side of the meter, and then spending capital on mitigation that was never going to fix it.
- Distortion measured downstream of the actual DISCOM point of common coupling.
- Upstream supply disturbance recorded as if the plant had generated it.
- Only one supply configuration measured on a site that alternates grid and captive generation.
- Furnace and drive loads assessed at part load rather than across the duty cycle.
- Mitigation specified without confirming the dominant harmonic orders.
- No re-measurement after a capacitor bank or filter changed the resonance picture.
THE OUTCOMES
What the Report Contains
The report separates what the plant injects from what it receives, because that distinction decides whether the remedy is yours to install or a matter to raise with the distribution licensee.
- 1Measurement point fixed on the single line diagram
- 2Voltage and current distortion against IEEE 519 at the PCC
- 3Individual harmonic orders and resonance risk
- 4Sags, unbalance and interruptions with likely origin
- 5Results for grid and captive supply where both apply
- 6Mitigation options with expected effect and assumptions
How We Run an Indian Power Quality Study
Fix the measurement boundary
Identify the point of common coupling with the distribution licensee and confirm which limits apply, including any state supply code requirement beyond IEEE 519.
Characterise the supply
Establish the DISCOM fault level and the normal supply configuration, including whether the site runs on captive generation for part of the duty cycle.
Measure across the duty cycle
Record at the agreed points for long enough to capture furnace cycles, drive loading and any switchover between grid and captive supply.
Separate injection from reception
Distinguish distortion the plant generates from disturbance arriving upstream, and identify the dominant harmonic orders and any resonance.
Report and recommend
Findings against the governing limits, mitigation options with expected effect, and documentation suited to CEIG review or a buyer audit.