An arc flash study for a Malaysian facility follows the same core process regardless of industry:
- Scope definition. Identify which panels, switchgear, and distribution points the study will cover.
- On-site data collection. Field engineers record equipment ratings, protective device settings, and system configuration.
- ETAP modelling. The collected data is built into a system model in ETAP software.
- Incident energy calculation. Using the IEEE 1584 method, incident energy is calculated at every working point in the model.
- PPE category and labelling. Each working point is assigned an arc flash boundary and PPE category, and labels are prepared for installation on equipment.
- Reporting. A final report package — aligned with MS IEC 60364 — documents every calculation, label, and recommendation for compliance under the Occupational Safety and Health Act 1994.