Can your switchgear clear what CFE can deliver
Fault current is set by the network, not by your load. When the supply is reinforced the duty on your equipment rises, and nothing inside your plant signals that it has happened.
What We Deliver
Fault duties at every bus
Three-phase and earth fault currents are calculated to IEC 60909 at each busbar, with peak, breaking and steady-state components, so each device is compared against the current it would genuinely have to interrupt.
WHY IT MATTERS
The supply changed and nobody told the switchgear
A network reinforcement raises available fault current without any change inside your boundary. Equipment adequate at commissioning can become under-rated silently, and the first indication is a device that fails to clear a fault.
- Fault level requested from CFE for the actual point of supply rather than inferred from transformer rating, which understates the duty on a strong network.
- Maximum and minimum source conditions both calculated: maximum governs equipment withstand, minimum governs whether protection picks up at all.
- Motor contribution above roughly 50 kW included, because large motors feed current into the first cycles of a fault.
- Devices relying on cascade or back-up protection identified and checked against the manufacturer's tested combination tables rather than curve overlap.
- Results carried directly into incident energy under IEEE 1584, since an arc flash assessment built on assumed fault current is not defensible.
DELIVERABLES
What you receive
A signed report against NOM-001-SEDE and IEC 60909, issued by the engineer who carried out the site work.
- 1Single line diagram reconciled against the installation as it is actually built
- 2Fault current table per bus with three-phase and earth fault duties
- 3Device-by-device comparison with an explicit pass or fail against nameplate interrupting capacity
- 4Uprating, current-limiting and network-splitting options for every device that fails
- 5The calibrated ETAP model, so the next supply change is a re-run rather than a new study
How the study runs
Walk-down and scope
A lead engineer verifies the single line diagram against the installation and records nameplate data from transformers, switchgear and large motors.
Source and asset data
CFE fault level is requested for maximum and minimum conditions, alongside transformer test certificates, cable schedules and protection settings.
Model build
The network is rebuilt in ETAP from verified data, and where records disagree with the installation the installation governs and the discrepancy is recorded.
Fault calculation
Symmetrical and asymmetrical fault currents are calculated at every bus across the switching configurations the plant actually operates in.
Adequacy comparison
Calculated duties are compared against installed ratings, and every shortfall is quantified rather than simply listed as a warning.
Report and handover
Findings are ranked by consequence, mitigation is costed, and the model is handed over with a walkthrough for your maintenance team.