What is it?

Power quality analysis checks the power supply for safety and efficiency.

Years of experience?

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus

Terms of service?

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus,

Electrical Standards

LRED

LRED

RED

LRED

LRED

RED

LRED

LRED

RED

LRED

LETS DISCOVER MORE

motor-start-analysis-1

Korean businesses may use CareLabs’ Motor start research and analysis services. Our motor start analysis service’s main goal is to ascertain what odd things happen when a large motor is started. Before starting an electric motor, there are other factors to consider in addition to making sure the connection to the line voltage is correct. For instance, unneeded tripping, high nominal currents, and dimming or flickering lights are all indications that a power system is malfunctioning. CareLabs will send skilled workers to your place to gather both recent and old information on the installation of your motors. Then calculations are performed using the manufacturer’s data and information to forecast future events and create mitigation plans.  

motor-start-analysis-2

Motor starting techniques may be examined using static and dynamic simulations. Our primary area of interest is dynamic motor beginning research, which simulates several motors starting scenarios, including:

  • The measured starting impedance of the electric motor is simulated to arrive at the load flow solution.
  • The voltage drop approach is used to calculate the initial current in a motor when it is turned on, whereas the short-circuit technique is used to compute the current under pre-fault short circuit conditions.
  • The dynamic model of the electric motor may be utilized in a conventional transient stability technique to evaluate the effects of motor starting if the electric motor circuit and load-torque parameters are appropriately modelled.
  • Transient stability simulations can be used if a comprehensive dynamic model of the electric motor is not available.
motor-start-analysis-3

Korean Should Conduct an Analysis of Motor Start:

The size of electric motors is growing rapidly in modern industrial systems. Turning on a huge power line-connected motor can damage the electric motor, neighboring loads, and even distant buses. The motor terminal must have 80% of the rated voltage to start an electric motor. Since a motor’s load torque is proportional to its terminal voltage squared, voltage difference immediately affects its load torque characteristic. If the voltage drops significantly, the machines may exceed their “breakdown torque” and slow down or stop. Voltage drop also affects electrical machinery, delicate control systems, lighting loads, etc. All steady-load systems need extra current due to high starting current, which affects terminal voltage. Low-voltage relays are also faulty.

motor-start-analysis-4

When Is a Motor Start Analysis Required?

  • Before or during the purchase of a large motor.
  • A backup generator must be built if there is no generator, and the motor rating is greater than 30% of the supply transformer’s base KVA rating.
  • The generator should be replaced if it is the only source of power for the system and the motor rating exceeds 10% to 15% of the generator’s KVA rating.
  • If many motors start at once during an industrial process, a motor start study may be required.
  • Voltage drops difficulties when starting a motor with a high-power output are exacerbated since smaller power supplies frequently provide less power. Understanding the output of tiny generator-powered systems could be made easier by looking at how motors start.
motor-start-analysis-5

Examining the Benefits and Drawbacks of Motor Start:

Find out how a motor starts. Select a motor or starting method that has the ideal speed-torque properties for the job. Certain loads must be managed rapidly to avoid exceeding the equipment’s torque limitations. You may always check the motor’s shaft performance by executing a motor start test. As a result, it aids in determining how much torque the machinery can handle. Research on motor beginning is required to determine how starting impacts the machine’s voltage and whether an electric motor can start and accelerate quickly.  

To assist you in assessing the operation of your electric motor, CareLabs provides motor start tests that are performed by qualified professionals. We provide motor start analysis services in Seoul, Busan, Incheon, Daegu and Gwangju, among other important cities. For further information or to book your motor beginning study, please contact us as soon as you can. 