IEEE 1584 · Engineering

Harmonic Study and Analysis in Italy | Carelabs Experts

Power factor correction capacitors, if not sized and placed correctly, can shift a system's resonant frequency toward a harmonic already present from nonlinear loads — turning a power-factor fix into a new harmonics problem. Carelabs' harmonic studies for Italian facilities model system impedance versus frequency to check for this risk before or after a power-factor correction project, and recommend relocating or adjusting capacitance where needed. Every engagement concludes with a CEI 64-8-aligned report package.

Free Consultation

Your position at the point of delivery

Harmonic current injected into the distributor's network is a matter between your installation and the operator. CEI 0-16 governs the connection of users to MV networks, and distortion is part of what that relationship covers.

What We Deliver

Compliance assessed where it applies

Measurement is taken at the point of delivery, because that is the boundary at which emission is assessed. Distortion recorded at an individual drive panel will look alarming and establishes nothing about your position.

WHY IT MATTERS

The problem arrives after a change

Harmonic failures rarely develop gradually. They appear when something moves the resonant point: a new capacitor stage, a transformer replacement, or a reinforcement by the distributor that strengthens the supply.

  • Measurement logged across a representative operating period, since distortion follows load and a single snapshot answers the wrong question.
  • Voltage and current distortion both reported, because one describes what your plant experiences and the other what you are injecting.
  • Demand-referenced current distortion used for the compliance position, as distortion expressed against instantaneous current rises at light load even when nothing has changed.
  • Transformer derating assessed where distortion is significant, since eddy current losses rise sharply with harmonic order and consume capacity already paid for.
  • Neutral loading checked on four-wire distribution, because triplen harmonics add rather than cancel and can exceed phase current in a conductor sized on the opposite assumption.
Contact Us

DELIVERABLES

What you receive

Issued against CEI 64-8 and the distortion limits applicable at your connection, with the measurement basis stated.

  1. 1Measured voltage and current distortion at the point of delivery, with the full spectrum
  2. 2Assessment against the limits applicable to your connection, with the basis of each limit stated
  3. 3Attribution by feeder showing which loads produce which harmonic orders
  4. 4Frequency scan identifying resonance points and the margin to each
  5. 5Mitigation options compared: line reactors, DC link chokes, tuned filters, active filters or detuning
Reach Out

How the study runs

01

Establish the driver

We agree whether the work supports a connection or capacity application, diagnoses recurring failures, or clears a planned load addition before purchase.

02

Fix the measurement points

The point of delivery is established first for the compliance position, with feeder points added where attribution is needed.

03

Log a representative period

Measurement covers the real operating cycle, including start-up and the low-load periods when capacitor stages switch and behaviour changes.

04

Model and scan

The network is built in ETAP and a frequency scan locates resonance, which governs which mitigation is safe and which would make matters worse.

05

Assess and attribute

Results are compared against applicable limits and the spectrum is used to identify responsible loads, so treatment is directed rather than applied broadly.

06

Report and options

Each mitigation option is presented with what it addresses and what it does not, so source-side and busbar-side treatment can be compared honestly.

Frequently asked questions

Because that is the boundary where emission into the distributor's network is assessed. Measurements inside the installation are useful for attribution, showing which loads produce what, but they do not establish a compliance position. A drive terminal will always show high distortion and says nothing about your obligations at the connection.
It can, which is counter-intuitive. Resonance between power factor correction capacitors and the supply transformer depends on source impedance, so a reinforcement moves the resonant frequency. If it moves onto an order your plant produces, distortion is amplified and capacitors begin failing, with nothing inside your installation having changed.
It is the cheapest point at which to ask. Modelling the planned load against the existing network establishes whether distortion will remain within limits and whether the addition moves a resonance, before equipment is ordered. Discovering the problem after commissioning means retrofitting mitigation at considerably higher cost.
That is a useful and fairly common result. A documented position prevents money being spent on filters or repeated capacitor replacement and redirects the investigation to whatever is actually causing the recurring fault, which is frequently a protection setting or an equipment immunity issue rather than distortion.